
|

 |
MetroRail Extension - Earlington Heights Connector
A new 2.4 mile extension of Metrorail to the central transportation hub at Miami International Airport. This new link, developed in conjunction with the Florida Department of Transportation (FDOT), will help provide seamless access to all modes of transportation.
This metrorail extension will provide both residents and visitors alike with a rapid transit connection to the airport. |
 |
Miami Dade College Science Building
This technologically advanced building located at the North Campus of Miami Dade College is a 90,000 gross square foot facility housing Classrooms, Biology Labs, Physics Labs, Anatomy Labs, Chemistry Labs, Lecture Halls, and Administrative Offices, which provide an enhanced learning environment at the college. |
 |
GSA Trade Shop
A 100,000 sf LEED Silver Certified facility, designed to serve as a base for construction managers, record management and trade shops personnel. Facility is comprised of flexible office space, warehouse and operational spaces for electrical, air conditioning, plumbing and carpentry workshops. |
 |
South County Courthouse
HVAC, Plumbing, Fire Sprinkler, Electrical, Telecommunications and Security Systems for the construction of a new 75,000 square foot addition and renovation of 68,000 square feet of the existing Courthouse facility serving the judicial system of Palm Beach County. |
 |
Jorge Mas Canosa Middle School
This facility, designed as an Enhanced Hurricane Protection Area (EHPA), provides emergency electric, water and sewer services to selected areas of the building to provide shelter for occupants during a hurricane. The facility was designed, constructed and delivered on time and budget to the Miami Dade County School System via the design build delivery method. |
 |
Regional Commuter Facility
This 67,000 sq. ft. facility located at the West End of the Miami International Airport's North Terminal Development, is designed for the use of American Eagle commuter airplanes providing two additional gates as well as access to 16 commuter jets. |
 |
Miami-Dade's Children's Courthouse
Is a new state of the art, and LEED Silver, fourteen story, 371,500 square foot courthouse consolidating all juvenile and children services for Miami Dade County. The facility will house courtrooms, community meeting rooms, offices, public waiting areas, detention areas, judicial collegial spaces, vehicular Sallyport and a pedestrian bridge from a secured outdoor parking. |
 |
Westland Hialeah Senior High School
This four building campus comprised of 325,000 sq. ft, equipped for 1,964 student stations, was constructed on a compact 6.5 acre urban site. The facility was designed, constructed and delivered on time and budget to the Miami Dade County School System via the design-build delivery method. |
 |
Norma Bossard Butler Elementary School
The project was developed as 3 Buildings around a central courtyard. These buildings house Administrative Offices, Media Center, Kitchen, Dining Room and Classrooms for a K-5 curriculum. This 100,000 sq ft facility accommodating 1,068 student stations was designed, constructed and delivered to the Miami Dade County School System via the design build delivery method in 14 months, on time and on budget. |
 |
Prototype Elementary School
Working for the Miami Dade County School Board with their selected Construction Manager, three (3) prototype schools were provided simultaneously on three (3) different sites. These 98,000 sq ft facilities each accommodate 1200 student stations ranging from K-5. |
 |
E.
L. Whigham Elementary School
Due to its flexibility, this 100,000
square foot Prototypical Elementary School has been commissioned
for re-use by the Miami-Dade School Board on five different
occasions. Centered around an open courtyard, the MEP Engineering
Systems provide an efficient cost effective design.
|
 |
Tropical
Shipping
The Miami Facility for the largest
containerized cargo carrier in the Caribbean features over
160,000 square feet of storage space and 10,000 square feet
of office space. The Facility included state of the art
life safety and security systems to protect millions of
dollars of stored goods and materials. |
 |
Concourse
H Improvement -Phase II
This engineering endeavor required
the demolition and reconstruction of 245,000 square feet
of an existing, operational airport concourse in multiple
complex phases and inclusive of complete life safety system
protection.
|
 |
Hollywood
Branch Library
This 20,000 square foot neighborhood branch library, nestled
within a serene wooded residential environment, was provided
with engineering systems sensitive to the neighboring residential
neighborhoods which allows the Library to function. |
 |
Miami
International Airport
Centralized 400 Hz & PCA Systems
Through four (4) projects, various
400 Hz and pre-conditioned air (PCA) systems have designed
for service to more than eighty (80) aircraft gates at this
airport. |
 |
Radio
TV Marti
Commissioned by the United States Information Agency, Office
of Cuba Broadcasting, this highly sensitive radio and television
production and broadcast facility features state of the
art electronic equipment served by multiple redundant systems. |
 |
North
County Government Center Courthouse
The 70,000 square foot addition to the existing Palm Beach
County courthouse facility provided for complete HVAC, Electrical,
Plumbing, Fire Protection, and Security Systems upgrades
for the entire facility. |
 |
North
Miami Beach Senior High School
The safety-to-life improvements for this existing
150,000 square foot, 2,500 student high school included
a facility wide fire sprinkler system, fire alarm system,
as well as a 12,000 square foot Science Wing addition.
|
 |
Murray
Park Multipurpose Center
This neighborhood community building for the City
of South Miami, the first phase of a neighborhood revitalization
plan, includes a full size indoor basketball gymnasium and
various multipurpose rooms. |
 |
West
Kendall Fire Rescue Station No. 57
An approximate 7,200 square foot fire fighting facility
provided for servicing and responding to community emergencies.
It was designed to allow for uninterrupted operation of
the entire facility for a period of 48 hours. |
 |
Booker
T. Washington High School
The engineering design for the historic structure included
HVAC, Electrical, Plumbing, and Fire Protection systems
for a new 3-story Classroom Building, 2500 seat Gymnasium
and an 825 seat Performing Arts Auditorium. |
 |
Florida
International University
Green Library
The engineering design for a new 8-story structure located
on top of an existing, fully functional, 3-story Library,
required extraordinary coordination for the implementation
of MEP/FP systems for 200,000 square feet of new construction. |
 |
Airport
Rescue Fire Fighting Facility
This five bay 26,000 square foot facility, located in the
central airfield of Fort Lauderdale International Airport,
provides a centralized fire rescue service to the entire
airport. This self-sufficient facility is provided with
a central emergency operations communications command center
on the second level. |
 |
Allapattah
Elementary School
The three building addition to the existing campus provided
the facility with a new Media Center Library, an Art Building
and a Music Building. Each building’s engineering
system was designed to meet the specific and unique requirements
of each building’s curriculum. |
 |
Tropical
Park Equestrian Center
This 55,000 square foot equestrian facility, complete with
two clay show rings and seating for over 1,000 guests, the
first of its kind for Miami-Dade County and South Florida,
currently hosts over 36 shows a year, providing a local
venue for the showcase of exotic equestrians. |
 |
Concourse
“A”, Phase II
This second phase included the
extension of this concourse by adding ten (10) new gates
with fully nested M/E/P/FP systems as well as retrofitting
various life systems at Phase I.
|
 |
Dade
County Courthouse
The renovation for the historic, 1925, 28-story structure
provided extensive air conditioning, fire sprinkler, fire
alarm and electrical systems upgrades for over 262,000 square
feet of multi-use office space. |
|
| |
|